Sidon Municipality crews remove a fallen electricity pole in front of Assiran Hospital and reopen the road to traffic
Sidon Municipality – Media Office
The emergency crews and technical teams of the Municipality of Sidon, in cooperation and coordination with the Electricity Company and Hlehleh subscriptions, removed an electricity pole that had fallen onto the main road in front of Assiran Hospital after a nearby tree, which had become entangled around the pole, fell due to the storm and strong winds that hit the city overnight.
Upon receiving the report, the field teams immediately worked to remove the pole and the wires stretched across the asphalt and eliminate the danger to pedestrians and drivers, fully reopening the road and facilitating the flow of traffic.
Following the removal of the debris, the cleaning crews began sweeping and cleaning the street to ensure public safety and facilitate the movement of citizens.
As Part of Its Comprehensive Campaign Across the City’s Neighborhoods: Sidon Municipality Carries Out a Pesticide Spraying and Thermal Fogging Campaign in Al-Taamir and Its Schools
Following Museum Night: Saida Municipality President Engineer Mustafa Hijazi tours the city’s historic museums, highlighting its rich cultural and historical heritage
Sidon Municipality crews remove a fallen electricity pole in front of Assiran Hospital and reopen the road to traffic
Sidon Municipal Police Arrest Motorcycle Thieves Near the Municipal Stadium and Hand Them Over to the Internal Security Forces Sidon Municipality – Media Office
Over Two Consecutive Nights: Sidon Hosts “ARIJ Music Nights” with Wide Participation and Official and Public Attendance Sidon Municipality – Media Office
Sidon Municipality Emergency Teams Close Open Sewage Drains and Replace Stolen Covers to Ensure Public Safety
Hijazi Receives a Delegation from the Ministry of Foreign Affairs to Discuss Cooperation as Part of Preparations for “Sidon, Mediterranean Capital of Culture and Dialogue 2027”
A Step Makes a Difference: Breast Cancer Early Detection Campaign
Sidon Municipality’s Generator Sector Regulation Committee Issues Statement on Electricity Subscription Costs for September 2026
Under the Supervision of the Municipality of Sidon and the Generator Sector Regulation Committee: Management of the Generator Network in the Rijal Al-Arbaeen Neighborhood Transferred from “Al-Masdar Subscriptions” to “Al-Akawi Subscriptions”